Door Lock Installation Service Singapore Pools 4dExtrutech Plastics is the premier Manufacturer of Plastic Panels, Products & Components for Car Washes, Agricultural Building, Food Processing, Commercial. Need a new door? Click here to find out more. Auto gate is a leading supplier of automatic garage door and automatic gate motors. We are able to service the entire Gauteng region which includes Johannesburg. We cover here ten steps on installing interlocking concrete pavers: 1. Planning the project; 2. Underground investigations. How To Install Interlocking Concrete Pavers Planning the project Underground investigations Excavation Base installation Edge Restraint installation Screening the Bedding Sand Layering Pavers Cutting Pavers Compacting & Setting Finishing Step 1. Planning Begin the planning process by drawing a diagram of the area you want to pave, noting any existing structures such as buildings, fences and other paved areas. Your local paver supplier or dealer can help you determine the best stones and the proper amount of supplies you need. Underground investigations Contact your local utility companies before you begin excavation to ensure you are aware of the location of any underground utilities, so that you are safe from injury and to prevent damage to any underground utilities. Excavation Stake out an area approximately 1. Plan to slope the paving deck away from the buildings in the direction of normal drainage. ![]() Make sure that you have 9. You can do this by using the 3- 4- 5 triangle method. From the corner stake, measure 3 foot across the base and 4 foot up the side. The diagonal line joining these two points should be 5 foot. If it is not, adjust the 4 foot side until the diagonal is exactly 5 foot. To achieve this, excavate between 7 inches and 9 inches deep to allow for base material, sand and block pavers. Door Lock Installation Service Singapore Pools OddsTo achieve this, excavate about 9”- 1. Remember to excavate 1. Base installation For large paved areas compact the surface of the excavated soil with a plate compactor (you can rent these). ![]() We provide excellent essay writing service 24/7. Enjoy proficient essay writing and custom writing services provided by professional academic writers. MoolahSense is Singapore's leading P2P lending platform. Flexible short-term business loans for local SMES and high investment returns for private investors. Shop Door Locks & Handles at acehardware.com and get Free Store Pickup at your neighborhood Ace. Buy Online & Pickup Today. See Details. 281 reviews of American Vision Windows "5 stars well deserved for Craig and his team at American Vision Windows installing my new custom Anlin windows and doors. Offers hinges in a variety of styles, finishes, and manufacturers. In smaller paved areas a hand tamper may be sufficient. Fill the area with 3/4” minus crushed stone or aggregate approximately 5” thick. Compact this with the plate compactor. Wetting the gravel lightly with water will help with the compacting. When you can walk on the gravel without causing an indentation you can add the next layer of gravel and compact it. Continue to add gravel in layers until the base is approximately 3” to 3- 1/2” from the desired level of the finished grade. The slope should be 1/8” per foot. Install a level line across the area using a line level. On the stake that is at the end you want to slope towards, move the line down 1/8” for every foot of pavement. For example, if your paving will be 8’ long, move the string down 1”. Measure the distance from the line to the base. HomeAdvisor's Locksmith Cost Guide lists price information associated with hiring a locksmith service, as reported by HomeAdvisor customers. The distance should be equal all along the line. For example, if your paving will be 8’ long, move the string down 1”. Measure the distance from the line to the base. The distance should be equal all along the line. They should always be used. You can use PVC, aluminum, concrete or pressure- treated wood. Precast concrete curbs are recommended because they are easy to install, are very durable and will accent your paving stone. Use the 3- 4- 5 triangle method to make sure that all corners are exactly 9. Screening the Bedding Sand Before you can lay the pavers, a bed of sand must be prepared. Use 1” outside diameter galvanized electrical conduit, strips of wood or other suitable material, such as screed rails, and place them 6’ to 8’ apart down the area to be paved. Measure the distance from the string lines and the screed rails at several points. If necessary, adjust the height of the rails by putting sand under them or trimming the base underneath if too high. Hand pack bedding sand around the rails to hold them in place. Spread 1” of sand between the rails until it is slightly higher than the rails. Use a 2” x 4” board to drag across the top to smooth and level the surface. Fill in the low spots and repeat. Remove the rails and fill in the indentations with sand, and trowel smooth as you are laying the pavers. Do not step on, compact or wet the sand after you have finished screening. Layering Pavers Starting in a 9. Work outwards keeping all joint lines straight. Use string lines pulled along joint lines and parallel to the edge restraints or, chalk lines snapped on the surface of the sand bed to keep the joint lines straight. Leave a 1/8” space between pavers. Each paver should touch the string. If adjustment is needed use a screwdriver and hammer to move it into place. Work off the pavers you have already installed but stay away from the edge so you do not disturb the sand bed. Install remaining edge restraints. Do not try to turn the pavers with curves in your laying pattern. Cut pavers to fit along the edge restraints. Cutting Pavers Measure and mark the pavers to be cut with a marking crayon. A diamond blade wet saw, paver splitter or a hammer and chisel can be used to cut pavers. Always wear safety glasses. If possible, keep edge stones to one half paver. Compacting & Setting Sweep the surface with a brush to remove any debris. Spread masonry sand over the surface, sweeping it into the joints leaving surplus sand on the pavers. Tamp the pavers down using the plate compactor. The excess sand on the pavers will cushion the surface and the vibration will assist in filling the joints. Spread more masonry sand if required. Make two or three passes at 9. Finishing Sweep the remaining excess dry sand over the surface filling the joints. You will have to repeat this over the next few days as the sand settles and the rain compacts it.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
August 2017
Categories |